PIP ELSSG04

$50.00

Sale!
-50%

PIP ELSSG04

$50.00

Automatic Transfer Systems for Secondary Selective Substations [New Practice]
standard by Process Industry Practices, 09/01/2008

Category:

Description

This Practice describes minimum requirements for design, performance, inspection, testing, and documentation, for delayed transfer automatic transfer systems (ATS) for two-source secondary selective substations. ATS provides automatic restoration of bus voltage upon loss of one of the sources. This Practice also covers remote monitoring and control requirements. This Practice does not cover fast transfer or delayed in-phase transfer systems.

Product Details

Edition:
1st
Published:
09/01/2008
File Size:
1 file , 250 KB
Note:
This product is unavailable in Belarus, Russia, Ukraine

PIP ELSSG04

$50.00

Sale!
-50%

PIP ELSSG04

$50.00

Automatic Transfer Systems for Secondary Selective Substations [Complete Revision]
standard by Process Industry Practices, 09/01/2013

Category:

Description

This Practice describes minimum requirements for design, performance, inspection, testing, and documentation, for delayed transfer automatic transfer systems (ATS) for two-source secondary selective substations. ATS provides automatic restoration of bus voltage upon loss of one of the sources. This Practice also covers remote monitoring and control requirements. This Practice does not cover fast transfer or delayed in-phase transfer systems.

Product Details

Published:
09/01/2013
Number of Pages:
18
File Size:
1 file , 400 KB
Note:
This product is unavailable in Belarus, Russia, Ukraine

PIP ELSSG04

$75.00

Sale!
-50%

PIP ELSSG04

$75.00

Automatic Transfer Systems for Secondary Selective Substations [Complete Revision]
standard by Process Industry Practices, 05/01/2018

Category:

Description

This Practice describes minimum requirements for design, performance, inspection, testing, and documentation, for delayed transfer automatic transfer systems (ATS) for two-source secondary selective substations. ATS provides automatic restoration of bus voltage upon loss of one of the sources. This Practice also covers remote monitoring and control requirements. This Practice does not cover fast bus transfer or delayed in-phase transfer systems.

Product Details

Published:
05/01/2018
Number of Pages:
18
File Size:
1 file , 790 KB
Note:
This product is unavailable in Belarus, Russia, Ukraine