Sale!
-50%
Standard Welding Procedure Specification for Shielded Metal Arc Welding of Carbon Steel (M-1/P-1/S-1, Group 1 or 2), 1/8 through 3/4" Thick, E6010 (Vertical Uphill) Followed by E7018 (Vertical Uphill), As-Welded Condition, Primarily Pipe Applications
standard by American Welding Society, 05/28/1996
AWS B2.1-1-201-96 (R2007)
$299.00 $149.50