AASHTO T 99-10

$34.00

Sale!
-50%

AASHTO T 99-10

$34.00

Standard Method of Test for Moisture-Density Relations of Soils Using a 2.5-kg (5.5-lb) Rammer and a 305-mm (12-in.) Drop
standard by American Association of State and Highway Transportation Officials, 2010

Category:

Description

These methods of test are intended for determining the relation between the moisture content and density of soils compacted in a mold of a given size with a 2.5-kg (5.5-lb) rammer dropped from a height of 305 mm (12 in.). Four alternate procedures are provided as follows:

  • Method A–A 101.60-mm (4-in.) mold: Soil material passing a 4.75-mm (No. 4) sieve.
  • Method B–A 152.40-mm (6-in.) mold: Soil material passing a 4.75-mm (No. 4) sieve.
  • Method C–A 101.60-mm (4-in.) mold: Soil material passing a 19.0-mm (3/4-in.) sieve.
  • Method D–A 152.40-mm (6-in.) mold: Soil material passing a 19.0-mm (3/4-in.) sieve.

This test method applies to soils mixtures that have 40 percent or less retained on the 4.75 mm- (No. 4) sieve, when Method A or B is used and 30 percent or less retained on the 19.0-mm (¾-in.) sieve, when Method C or D is used. The material retained on these sieves shall be defined as oversize particles (coarse particles).

If the test specimen contains oversize particles, and the test specimen is used for field density compaction control, corrections must be made according to T 224 to compare the total field density with the compacted specimen density. The person or agency specifying this method shall specify a minimum percentage of oversize particles below which correction for oversize need not be applied. If no minimum percentage is specified, correction shall be applied to samples with more than five percent by mass of oversize particles.

If the specified oversized maximum tolerances are exceeded, other methods of compaction control must be used.

Note – One method for the desin and control of the compaction of such soils is to use a test fill to determine the required degree of compaction and a method to obtain that compaction. Then use a method specification to control the compaction by specifying the type and size of compaction equipment, the lift thickness and the number of passes.

Product Details

Published:
2010
Number of Pages:
13
File Size:
1 file , 1.7 MB